HELMS Completed 12 CPT points from Singapore to Malaysia
Kuala Lumpur, 8 December 2017 – In support of dredging works which to be carried out prior to laying of power cables from Sembawang, Singapore to Senibong, Johor, Malaysia, Helms Geomarine Sdn Bhd was hired to carry out 12 CPT points along the proposed cable route. The objective of the CPT testing was to determine the method and pressure needed in order to dredge the soil layers along the cable route as part of the cable burial assessment. Helms is pleased to announce that all 12 CPT points has been successfully completed within a period of 48 hours.